Laboratory refurbishment in Germany
Laboratory refurbishment in Germany
HVAC design for constructability and design for maintainability reviews and HVAC normative compliance checks were done on chemical industrial corporate laboratory extension project spanning over 14,200 sqm. TÜV SÜD model check was also done during the technical design stage. TÜV SÜD model check including design review only took 4-man days.
We require your consent to load YouTube/Google Map. This service uses cookies that are set when loading. In this case, your personal data will be transmitted to third-party platforms and to countries that the EU does not consider to have a comparable level of data protection. To enable the services and give your consent, click on ‘Manage cookie settings’ and select ‘Targeting cookies’. You can withdraw your consent using the cookie hover, which does not affect the lawfulness of processing before a withdrawal. Refer to data protection information for more details.
We require your consent to load YouTube/Google Map. By clicking on “view video”, you will enable the service and give consent for your personal data to be transmitted to third-party platforms and countries that the EU does not consider to have comparable level of data protection. You can withdraw your consent using the cookie hover, which does not affect the lawfulness of processing before a withdrawal. Refer to data protection information for more details.
We require your consent to load YouTube/Google Map. This service uses cookies that are set when loading. In this case, your personal data will be transmitted to third-party platforms and to countries that the EU does not consider to have a comparable level of data protection. To enable the services and give your consent, click on ‘Manage cookie settings’ and select ‘Targeting cookies’. You can withdraw your consent using the cookie hover, which does not affect the lawfulness of processing before a withdrawal. Refer to data protection information for more details.
Reach out to tobias.schmidt@tuvsud.com for more information. Tobias is the global manager for digital lifecycle solution in TÜV SÜD.
As one of the top 5 global chemistry corporates with Commercial Real Estate (CRE) assets in over 80 countries, they run extensive and recurring laboratory construction projects in both green and brown fields. Due to extensive government testing and medical development, the laboratories need to be built within the allocated time and budget. Since 2018, BIM model check has become an integrated part of its building quality & risk management strategy. TÜV SÜD is the mandated 3rd party general quality auditor across design and construction stages, including BIM management. BIM model check helps to reduce audit time and benchmark the project quality over other projects in other countries.
Site Selector
Global
Asia
Europe
Middle East and Africa